CHIEF OF NAVAL OPERATIONS INTEGRATED VULNERABILITY ASSESSMENT ( CNOIVA) SCHEDULE CHANGE UNCLASSIFIED/ PASS TO ALL OFFICE CODES: FM CNO WASHINGTON DC//N4// SUBJ: CHIEF OF NAVAL OPERATIONS INTEGRATED VULNERABILITY ASSE...:

UNCLASSIFIED//
ATTENTION INVITED TO  
ROUTINE
R 182247Z APR 13 PSN 135563K23
FM CNO WASHINGTON DC
TO NAVADMIN
ZEN/OU=DOD/OU=NAVY/OU=ADDRESS LISTS(UC)/CN=AL NAVADMIN(UC)
INFO ZEN/CNO WASHINGTON DC
BT
UNCLAS
QQQQ
SUBJ: CHIEF OF NAVAL OPERATIONS INTEGRATED VULNERABILITY ASSESSMENT (
CNOIVA) SCHEDULE CHANGE
UNCLASSIFIED/
PASS TO ALL OFFICE CODES:
FM CNO WASHINGTON DC//N4//
TO NAVADMIN
UNCLAS
NAVADMIN 104/13

MSGID/GENADMIN/CNO WASHINGTON DC/N4/APR//

SUBJ:  CHIEF OF NAVAL OPERATIONS INTEGRATED VULNERABILITY ASSESSMENT (CNOIVA) 
SCHEDULE CHANGE//

REF/A/DOC/DODI 2000.16/31OCT2006//
REF/B/DOC/DTRA JSIVA GUIDELINES/01JAN2008/NOTAL//
REF/C/DOC/OPNAVINST 3300.53C/26MAY2009//
REF/D/DOC/NAVADMIN 12319/26OCT2012//
NARR/REF A IS DEPT OF DEFENSE (DOD) ANTITERRORISM STANDARDS.  REF B IS DEFENSE 
THREAT REDUCTION AGENCY (DTRA) ANTITERRORISM VULNERABILITY ASSESSMENT TEAM 
GUIDELINES.  REF C IS NAVY ANTITERRORISM PROGRAM.  REF D IS ORIGINAL NAVADMIN 
PROMULGATING FY13 CNOIVA SCHEDULE// POC/CDR A. L. SCHREIBER/CNO WASHINGTON 
DC/N462/LOC:  ARLINGTON, VA/ TEL: (703)695-5526, 
andrea.schreiber@navy.mil//

RMKS/1.  REF A, PARA 2, DIRECTS THE CONDUCT OF HIGHER HEADQUARTERS INTEGRATED 
VULNERABILITY ASSESSMENTS (IVA), USING BENCHMARKS CONTAINED IN REF B.  IAW REF 
C, NAVAL CRIMINAL INVESTIGATIVE SERVICE (NCIS) SECURITY TRAINING, ASSESSMENT 
AND ASSISTANCE TEAMS (STAAT) CONDUCT THE CNO ASSESSMENTS WHILE DTRA 
SCHEDULETHE MEMORANDUM FROM NCIS POSTPONING THE CNOIVAS.  TO THE, DSN:  
DTRADDDD CONDUCTS THE JOINT STAFF INTEGRATED VULNERABILITY ASSESSMENTS 
(JSIVA).

2.  DUE TO BUDGET CONSTRAINTS, THE FOLLOWING CNOIVAS ARE POSTPONED UNTIL FY14.
25-29 MAR 2013, CB CTR GULFPORT
15-19 APR 2013, NS GUANTANAMO BAY
06-10 MAY 2013, NAS JRB FORT WORTH
28 OCT-01 NOV 2013, NAS FALLON
SHOULD ADDITIONAL FUNDING BECOME AVAILABLE IN FY13, NCIS STAAT WILL CONDUCT A 
CNOIVA OF THE INSTALLATIONS.

3.  THE FOLLOWING INSTALLATIONS WILL RECEIVE INTEGRATED VULNERABILITY 
ASSESSMENTS BY DTRA:
14-19 JULY 2013, NAS KEY WEST
(DATE TBD) NAS LEMOORE
(DATE TBD) NWS SEAL BEACH

4.  THE FOLLOWING INSTALLATION WILL RECEIVE A JOINT SERVICES-SPONSORED (J34) 
ASSESSMENT IN FY14 VIA THE JOINT MISSION ASSURANCE ASSESSMENT PROGRAM (JMAAP) 
PROJECT:  (DATE TBD) NAVSUPPACT SOUDA BAY

5.  THE FOLLOWING CNOIVAS, SOME OF WHICH INCLUDE DEFENSE CRITICAL 
INFRASTRUCTURE PROGRAM ASSESSMENTS (DCIP), WILL BE CONDUCTED AS CURRENTLY 
SCHEDULED:
03-07 JUNE 2013, NAVSTA ROTA (INCLUDES DCIP)
29 JUL - 02 AUG 2013, COMFLEACTS CHINHAE, KOREA
19-23 AUG 2013, NAVAL STATION GREAT LAKES (INCLUDES DCIP)
03-13 SEP 2013, WPNSTA EARLE COLTS NECK
23-27 SEP 2013, NAS PATUXENT RIVER (INCLUDES DCIP)
09-13 DEC 2013, NAVSTA MAYPORT (INCLUDES DCIP)
(TBD) NAS PENSACOLA

6.  MITIGATION.  IN LIEU OF THE CNOIVA, POSTPONED COMMANDS WILL CONDUCT A 
THOROUGH LOCAL VULNERABILITY ASSESSMENT PRIOR TO OCT 2013, FORWARDING 
COMPLETED ASSESSMENTS TO THEIR RESPECTIVE REGIONS FOR REVIEW AND TRACKING.

7.  CONTACT CDR ANDREA L. SCHREIBER, COMM: 703-695-5526, DSN:
312-225-5526, E-MAIL: andrea.schreiber@navy.mil FOR ANY QUESTIONS  
CONCERNING THIS CHANGE.

8.  RELEASED BY VADM P.H. CULLOM, N4.//

BT
#4299
NNNN
UNCLASSIFIED//